So week 6 of the build and things are moving on apace.
The floor joists have gone in, the floor has gone down, the steel for the roof has arrived and the gable end is half built, ready for the roof to go up next week.
A redundant chimney is coming down on Monday and we should in a position for electricians and plumbers to do the first fix after the Christmas break.
Yay! so VERY excited at how things are coming along.